PROJECT SUMMARY
Location: Port of Alsea Marina, Waldport, Oregon, USA
Period: Q4/2020
Product type: DOP250 with cutter head
Contractor: Bergerson Construction, Inc
Marina dredging

On the North Pacific coast, the town of Waldport has a busy marina on the Alsea River. The marina is mainly used by locals and tourists for leisure activities as salmon fishing, crabbing and kayaking.

After years of winter storms, the port needed some maintenance dredging done as part of a larger marina improvement project.

The maintenance dredging job encompassed removing some 13.000 m3 (16.500 CY) of sand, at a maximum dredging depth of -2 m (6 ft).

The challenge was, that the marina had become so shallow over the years, that access had to be dredged before the actual production dredging could begin.

During the dredging activities the DOP250 was mounted on an Deere 470G excavator. The excavator itself was placed on a sectional barge platform.

This platform was moved around the harbour to clear the accumulated sand.

The sand was pumped over some 765 m (2500 ft) onto shore. Hence a nearby beach was restored, and neighboring properties were protected. The only challenge in the project was the presence of some woody debris.

While this debris slowed the dredging process somewhat, the wood chips were able to be pumped along with the sand slurry.